Lift Line and Halfpipe Cases (Ski Resort and Snow Park)
Connector test assembly: drive terminal, 12 m span, chairlift tower, 12 m span, gondola tower, 6 m span and return terminal aligned on the 8 m cable datum with a chair and a gondola hanging; beside it a two-row halfpipe run of left wall, tile and right wall joined by slope...
- 格式
- GLB
- 文件大小
- 320 KB
- 三角面
- 7,424
- 许可
- CC0 1.0