Lift Line and Halfpipe Cases (Ski Resort and Snow Park)

Connector test assembly: drive terminal, 12 m span, chairlift tower, 12 m span, gondola tower, 6 m span and return terminal aligned on the 8 m cable datum with a chair and a gondola hanging; beside it a two-row halfpipe run of left wall, tile and right wall joined by slope...

格式
GLB
文件大小
320 KB
三角面
7,424
许可
CC0 1.0

署名

这个模型不需要署名。这一行写明了它的来源。

"Lift Line and Halfpipe Cases (Ski Resort and Snow Park)", from 3DAssets.dev (https://3dassets.dev/assets/ski-resort-and-snow-park-lift-line-and-halfpipe-cases-f7c97e9e), CC0 1.0