Demolition wall section, down to rubble (Demolition and Site Clearance)

The same 4 m bay after the wall is down: a 500 mm stub of brickwork on the footing with the broken face showing, a heap of graded masonry rubble across the bay and two lengths of bent rebar lying in it, ready for the loader.

格式
GLB
文件大小
78 KB
三角面
612
许可
CC0 1.0

署名

这个模型不需要署名。这一行写明了它的来源。

"Demolition wall section, down to rubble (Demolition and Site Clearance)", from 3DAssets.dev (https://3dassets.dev/assets/demolition-and-site-clearance-demolition-and-site-clea-deca63ab), CC0 1.0

举报这个模型

告诉运营地球在线 3D 的人哪里不对:这不是上传者有权分享的内容、许可写错了、文件损坏或有害,或者内容令人反感。

取消