Demolition wall section, down to rubble (Demolition and Site Clearance)
The same 4 m bay after the wall is down: a 500 mm stub of brickwork on the footing with the broken face showing, a heap of graded masonry rubble across the bay and two lengths of bent rebar lying in it, ready for the loader.
- 格式
- GLB
- 文件大小
- 78 KB
- 三角面
- 612
- 许可
- CC0 1.0