Settling pond edge module (Ore Processing and Haulage Plant)
An 18 m module of settling pond edge: a compacted bank with a placed gravel beach, the water surface, a silt fence on stakes along the crest, a staff gauge at the water line, an outlet pipe through the bank to a headwall and a short handrail run.
- 格式
- GLB
- 文件大小
- 39 KB
- 三角面
- 718
- 许可
- CC0 1.0