Dam and Powerhouse Maintenance Route (Hydroelectric Dam Infiltration)
Connected intake pressure train feeds a roofed turbine house and tailrace alongside the spillway, with a guarded maintenance courtyard and a marked crest road.
- 格式
- GLB
- 文件大小
- 3.6 MB
- 三角面
- 224,044
- 许可
- CC0 1.0