Mud tracked site ground tile, 4 m (Demolition and Site Clearance)

The same 4 m site module with dried mud trodden across it by the plant: three spread patches standing a few millimetres proud of the slab with two wheel ruts run through them, for the working face and the haul line.

格式
GLB
文件大小
67 KB
三角面
72
许可
CC0 1.0

署名

这个模型不需要署名。这一行写明了它的来源。

"Mud tracked site ground tile, 4 m (Demolition and Site Clearance)", from 3DAssets.dev (https://3dassets.dev/assets/demolition-and-site-clearance-demolition-and-site-clea-68e643ab), CC0 1.0

举报这个模型

告诉运营地球在线 3D 的人哪里不对:这不是上传者有权分享的内容、许可写错了、文件损坏或有害,或者内容令人反感。

取消