Backstage Operator Bridge (Abandoned Puppet Theatre and Prop Vault)

Supported operator bridge with four legs, thick plank deck and rear safety railing; clear front permits puppet operation.

格式
GLB
文件大小
44 KB
三角面
2,464
许可
CC0 1.0

署名

这个模型不需要署名。这一行写明了它的来源。

"Backstage Operator Bridge (Abandoned Puppet Theatre and Prop Vault)", from 3DAssets.dev (https://3dassets.dev/assets/abandoned-puppet-theatre-and-prop-vault-backstage-oper-15be4168), CC0 1.0