Widened chamber cutaway review section (Underground Mine and Shaft Works)

A review variant of the widened chamber with the east wall removed so the excavated interior, roof frame and equipment plinth can be inspected and photographed from the side.

Format
GLB
File size
32 KB
Triangles
624
License
CC0 1.0
Source
3DAssets.dev

Credit

"Widened chamber cutaway review section (Underground Mine and Shaft Works)", from 3DAssets.dev (https://3dassets.dev/assets/underground-mine-and-shaft-works-drift-chamber-cutaway-597f067c), CC0 1.0