Lift Line and Halfpipe Cases (Ski Resort and Snow Park)

Connector test assembly: drive terminal, 12 m span, chairlift tower, 12 m span, gondola tower, 6 m span and return terminal aligned on the 8 m cable datum with a chair and a gondola hanging; beside it a two-row halfpipe run of left wall, tile and right wall joined by slope...

Format
GLB
File size
320 KB
Triangles
7,424
License
CC0 1.0
Source
3DAssets.dev

Credit

"Lift Line and Halfpipe Cases (Ski Resort and Snow Park)", from 3DAssets.dev (https://3dassets.dev/assets/ski-resort-and-snow-park-lift-line-and-halfpipe-cases-f7c97e9e), CC0 1.0