Settling pond edge module (Ore Processing and Haulage Plant)
An 18 m module of settling pond edge: a compacted bank with a placed gravel beach, the water surface, a silt fence on stakes along the crest, a staff gauge at the water line, an outlet pipe through the bank to a headwall and a short handrail run.
- Format
- GLB
- File size
- 39 KB
- Triangles
- 718
- License
- CC0 1.0
- Source
- 3DAssets.dev
Credit
"Settling pond edge module (Ore Processing and Haulage Plant)", from 3DAssets.dev (https://3dassets.dev/assets/ore-processing-and-haulage-plant-settling-pond-edge-e28c77f9), CC0 1.0