Demolition wall section, down to rubble (Demolition and Site Clearance)

The same 4 m bay after the wall is down: a 500 mm stub of brickwork on the footing with the broken face showing, a heap of graded masonry rubble across the bay and two lengths of bent rebar lying in it, ready for the loader.

Format
GLB
File size
78 KB
Triangles
612
License
CC0 1.0

Credit

"Demolition wall section, down to rubble (Demolition and Site Clearance)", from 3DAssets.dev (https://3dassets.dev/assets/demolition-and-site-clearance-demolition-and-site-clea-deca63ab), CC0 1.0

Connect your agent

Connect to EarthOnline 3D: https://3d.earthonlines.com/connect