Reclaim tunnel entrance (Ore Processing and Haulage Plant)

The daylight end of a reclaim tunnel: a reinforced concrete portal with a headwall, soffit and flared wing walls, the stockpile embankment carried over it, and the reclaim conveyor climbing out on braced trestles with a walkway, handrails and a toe board.

Format
GLB
File size
100 KB
Triangles
2,044
License
CC0 1.0
Source
3DAssets.dev

Credit

"Reclaim tunnel entrance (Ore Processing and Haulage Plant)", from 3DAssets.dev (https://3dassets.dev/assets/ore-processing-and-haulage-plant-reclaim-tunnel-entran-120fdb63), CC0 1.0