Backstage Operator Bridge (Abandoned Puppet Theatre and Prop Vault)
Supported operator bridge with four legs, thick plank deck and rear safety railing; clear front permits puppet operation.
- Format
- GLB
- File size
- 44 KB
- Triangles
- 2,464
- License
- CC0 1.0
- Source
- 3DAssets.dev
Credit
"Backstage Operator Bridge (Abandoned Puppet Theatre and Prop Vault)", from 3DAssets.dev (https://3dassets.dev/assets/abandoned-puppet-theatre-and-prop-vault-backstage-oper-15be4168), CC0 1.0